Customization: | Available |
---|---|
Type: | Copper Bars |
Application: | Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe |
Still deciding? Get samples of US$ 999/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
COMPANY PROFILE | |||||
Changsha Yuxin Steel Co., Ltd is honored import and export rights by government. We are the professional manufacturer and exporter of special steel and steel solution provider. We worked in steel industry more than 15years, always to provide high quality, competitive price and good solution for customers. | |||||
Our main products. Raw material in steel round bar, steel flat, steel plate, steel tube in carbon steel, alloy steel, tool steel, mould steel , bearing steel, stainless steel, super alloy, special alloy. And roller, shafts, cylinder, steel plank, steel rings, by casting, rolling, forged. Forgings according to drawings. We also provide steel machinery processing service, steel cut,steel milling, heat treatment, and mould base by CNC. Laser cut plate, Laser cut pipe, we have10 sets of 6KW laser cutting machine, 1 set of benders, 1 set of leveler machine for plates. We can make stainless steel box, stainless steel enclosure. OEM according to customers. Welcome to visit us and audit our factory. We insist on Quality First, Credit Frist. Hope we have chance to cooprate ! |
|||||
DESCRIPTION | |||||
Product | Copper/Brass product | ||||
Standard | ASTM, AISI, JIS, DIN, GB, EN | ||||
SAMPLE | Free,but customers need bear the courier costs. | ||||
Material | C10100,C10200,C10300,C10400,C10500,C10700,C10800,C10910,C10920,C10930 ,C11000,C11300,C11400,C11500,C11600,C12000,C12200,C12300,C12500,C14200, C14420,C14500,C14510,C14520,C14530,C17200,C19200,C21000,C23000,C26000 ,C27000,C27400,C28000,C33000,C33200,C37000,C44300,C44400,C44500,C60800 ,C63020,C65500,C68700,C70400 |
||||
Thickness | 0.1mm-120mm or as required | ||||
Width | 0.6m-3m or as required | ||||
Shape | Flat plate . Flat bar , Strip, Coil | ||||
Surface | mill,polished,bright,oiled,hair line,brush,mirror,sand blast,or as required | ||||
Length | Customized | ||||
Leading time | within 7-15 days | ||||
Application | 1. Pancake Coil for ACR, General Engineering Applications 2. LWC Coil for ACR, General Engineering Applications 3. Straight Copper Tubes for ACR and Refrigeration 4. Inner-grooved copper tube for ACR and Refrigeration 5. Copper Pipe for Transportation System of water, gas and oil 6.PE-coated copper tube for water/gas/oil transportation system 7.Semi-finished Copper tube for industrial applications |
||||
Stock | Ready in stocks. | ||||
Place of origin | China |
Applications: Copper is the most widely used and the largest consumption in electrical and electronic industry, accounting for more than half of the total consumption. Used for all kinds of cable and wire, motor and transformer winding, switches and printed circuit boards. In the manufacture of machinery and transport vehicles, they are used to manufacture industrial valves and fittings, instruments, plain bearings, dies, heat exchangers and pumps. In chemical industry, it is widely used in the manufacture of vacuum, still pot, brewing pot and so on. In the national defense industry used to manufacture bullets, shells, gun parts, etc., for every 1 million bullets produced, 13 to 14 tons of copper is used. In the construction industry, used as a variety of pipes, pipe fittings, decorative devices, etc. |
TYPES |
Product photo |
Testing |
Packing and Shipping |
Q&A |
Q:Can you send samples? |
A:A:We could send you the samples,sample cost is according to actual material cost and transport fee should be paid by you. |
Q:What product information do I need to provide? |
A:You need to provide the grade, width, thickness, coating and the number of tons you need to purchase. |
Q:What are the shipping ports? |
A:Under normal circumstances, we ship from Shanghai, Tianjin, Qingdao, Ningbo ports, you can choose other ports according to your needs. |
Q:How long does your delivery time take? |
A:In general, our delivery time is within 7-45 days, and may be delayed if the demand is extremely large or special circumstances occur. |
Q:Can I go to your factory to visit? |
A:Of course, we welcome customers from all over the world to visit our factory. |
Q:Does the product have quality inspection before loading? |
A:Of course, all our products are strictly tested for quality before packaging, and unqualified products will be destroyed. |
Q:Why choose us? |
A:Quality first is our faith,price is competitive,and we have worked in steel industrial more than 15 years,we have professional team and engineers can give technical support and service to meet your projects request.Welcome to visit us. |
Q:What is your terms of payment? |
A:We usually accept 30% T/T in advance.70% in the period of shipment.L/Cand other payment can negotiated. |